Glossary
Facility management glossary
Plain definitions of the terms a facility manager meets every week, from CAFM and CMMS to PPM, SLA and MTTR. Each term is given in English and Arabic. Where usage varies between organisations, the entry says so.
A
- Asset lifecycleدورة حياة الأصل
The stages an asset goes through from planning and purchase to installation, operation, maintenance, renewal or replacement, and finally disposal. Facility teams follow the lifecycle to decide when repairing an asset stops making sense compared with replacing it.
- Asset registerسجل الأصول
A structured list of the physical assets in a building or portfolio, such as air-conditioning units, lifts, pumps and generators. Each entry usually records the asset's type, location, identifiers and maintenance history, and the register is the base for planning maintenance.
B
- BPMN (Business Process Model and Notation)نموذج وترميز عمليات الأعمال (BPMN)
A standard way of drawing a process as a flowchart of steps, decisions and hand-offs, so that people and software read it the same way. In facility management it is sometimes used to document approval and maintenance workflows.
C
- CAFM (Computer-Aided Facility Management)إدارة المرافق بمساعدة الحاسوب (CAFM)
Software that helps manage buildings and the services around them, usually covering locations, assets, maintenance, work orders and requests. The term has roots in space and floor-plan management, and its exact scope varies between vendors.
- CMMS (Computerized Maintenance Management System)نظام إدارة الصيانة المحوسب (CMMS)
Software focused on maintenance work, such as scheduling preventive tasks, issuing work orders and tracking assets and spare parts. It is often used interchangeably with CAFM, although a CMMS is usually narrower and centred on maintenance.
- Corrective maintenanceالصيانة التصحيحية
Maintenance carried out after a fault or failure has been found, to bring an asset back to working condition. It can be urgent after a breakdown or planned for later when the fault is minor. It is often called reactive maintenance, though some organisations use the two terms slightly differently.
E
- EAM (Enterprise Asset Management)إدارة أصول المؤسسة (EAM)
Managing physical assets across their whole lifecycle, usually in asset-heavy organisations such as utilities, industry and large estates. It covers maintenance but also planning, cost, reliability and replacement decisions, so it is broader than a CMMS.
F
- First-time fix rateمعدل الإصلاح من المرة الأولى
The share of faults that are fixed on the first visit, without a return trip for missing parts, tools or skills. Organisations define the visit and the fix slightly differently, so agree the definition before comparing figures.
H
- Hard servicesالخدمات الصلبة (الخدمات الفنية)
Services tied to the fabric and fixed systems of a building, such as air conditioning, electrical, plumbing, fire protection and lifts. They are usually delivered by skilled technical trades and are often subject to statutory inspection.
I
- Inspection checklistقائمة الفحص والتفتيش
A list of items to check, in order, during a routine inspection or maintenance visit, with a result recorded for each item, for example pass, fail or a reading. It makes the check repeatable and leaves a record that it was done.
- IWMS (Integrated Workplace Management System)نظام إدارة مكان العمل المتكامل (IWMS)
A broad platform that combines real estate, space and occupancy, maintenance, projects and lease management. Its scope is usually wider than CAFM, and it is common in organisations that manage large property portfolios.
L
- Location hierarchyالتسلسل الهرمي للمواقع
The way sites are organised in levels, for example portfolio, site, building, floor and room. A clear hierarchy lets assets, requests and costs be tied to the exact place and reported at any level.
M
- Maintenance requestطلب صيانة (بلاغ صيانة)
A report from an occupant or staff member that something needs attention, such as a leak or a faulty light. It is reviewed, prioritised and, if accepted, usually turned into a work order.
- MTTR (Mean Time To Repair)متوسط وقت الإصلاح (MTTR)
The average time from when a failure starts or is reported until the asset is working again, over a chosen period. The letter R is sometimes read as restore or recovery, and the start and end points vary, so state them when quoting the figure.
P
- Planned preventive maintenance (PPM)الصيانة الوقائية المخططة (PPM)
Maintenance scheduled in advance at set intervals, by calendar time or by usage, to keep assets in good condition and reduce unexpected failures, whether or not a fault has appeared. It is shortened to PPM or PM, and organisations use the two abbreviations in slightly different ways.
- Predictive maintenanceالصيانة التنبؤية
Maintenance triggered by the measured condition of an asset, such as vibration, temperature or running hours, so that work is done shortly before a likely failure. It needs monitoring data and is usually applied to critical assets rather than to everything.
R
- Reorder levelحد إعادة الطلب
The stock quantity at which a new order should be placed so that an item does not run out before the delivery arrives. It is usually set per item, based on how fast the item is used and how long the supplier takes to deliver. It is also called the reorder point.
- Resolution timeوقت المعالجة (وقت الحل)
The time from when a request or fault is reported until it is resolved and the work is completed. It is commonly measured against a target in an SLA, and what counts as resolved (fixed, closed or accepted by the requester) varies by organisation.
- Response timeوقت الاستجابة
The time from when a request is reported until someone first acts on it, for example by acknowledging it, assigning it or arriving on site. It is separate from resolution time, and organisations define the first action differently.
S
- SLA (Service Level Agreement)اتفاقية مستوى الخدمة (SLA)
A written agreement between a service provider and a client that sets the expected level of service, usually including response and resolution times for each priority. In facility management it can be a contract with an outside provider or an internal agreement between teams.
- Soft servicesالخدمات الناعمة (الخدمات المساندة)
People-oriented services that keep a building clean, comfortable and usable, such as cleaning, security, landscaping, pest control, catering and reception. The line between hard and soft services varies by contract and by country.
- SOP (Standard Operating Procedure)إجراءات التشغيل القياسية (SOP)
A documented, step-by-step method for carrying out a task so that it is done the same way, and safely, every time. In maintenance it describes how to perform a job, including the tools needed, safety precautions and the steps in order.
- Spare parts and consumablesقطع الغيار والمواد الاستهلاكية
Spare parts are components kept in stock to replace worn or failed parts in assets, such as filters, belts, motors or valves. Consumables are items used up during maintenance, such as lubricants, cleaning materials or fuses. Both are tracked as stock so that work is not delayed waiting for them.
W
- Work orderأمر العمل
A document or record that authorises and describes a piece of maintenance work: what needs doing, where, on which asset, who does it and by when. It is also where time, parts used and completion notes are recorded.